Land Use Planning and Permitting
A “final map” is used when subdividing land into five or more parcels, while a “parcel map” is used when dividing land into four or fewer parcels; essentially, a final map represents a major subdivision, while a parcel map represents a minor subdivision.
“plat map” is a general term for a map showing property boundaries.
A “plan” is a sketch or drawing showing details of proposed construction.
Subdivision Map Act
Urban Lot Split
Legal Opinions
Locations
NORTHERN CALIFORNIA
Office: Geissler Engineering
83e Beach Road
Belvedere, CA 94920
Contact: Dr. Peter Geissler, PhD, PE (Civil)
Email: geissler@geissler-engineering.com
Tel: (415) 887-8704
SOUTHERN CALIFORNIA
Office: Geissler Engineering & Laguna Surveying
465 Forest Ave, Suite E
Laguna Beach, CA 92651
Mailing: Geissler Engineering & Laguna Surveying
303 Broadway Street
Suite 104-157
Laguna Beach, CA 92651
Contact: Dr. Peter Geissler, PhD, PE (Civil)
Email: geissler@geissler-engineering.com
Tel: (415) 887-8704 (mobile)
Tel: (949) 371-0626 (office)